Home
The Alliance
Join/Make a Contribution
What You Should Know
Transportation Planning
Regional Priorities
Capital Beltway (I-495)
Dulles Greenway
Dulles Loop
Dulles Rail
Eastern Bypass
Fairfax County Parkway
Gainesville Interchange Project
I-66 Inside the Beltway
I-66 Outside the Beltway
I-95/I-395 HOT Lanes
I-95 Fourth Lane
Intercounty Connector (ICC)
Loudoun County Parkway
Manassas Battlefield Bypass EIS
Route 7
Route 9
Route 15
Route 28
Route 659/Belmont Ridge Road
Springfield Mixing Bowl
Techway
Tri-County Parkway
Western Transportation Corridor
Woodrow Wilson Bridge
 
Transportation Funding
Virginia General Assembly
Alliance Survey 2009
Air Quality
Regional Security
Demographic Information
Travel Demand Profiles
Transportation Links
Alliance Alert Archives
Contact Us
Route 7
Route 7 Upgrade
(Last Updated July 2010)

Alliance Position:
Re-construct as limited access facility with a minimum of three lanes in each direction between the Fairfax/Loudoun County line and Dulles Toll Road in Tysons Corner.

The Project:
Widening 8.48 miles of Route 7 to six-lanes with a median from the Fairfax/Loudoun County line to the Dulles Toll Road.

Current Status:
Right-of-way acquisition for the Rolling Holly Drive to Reston Avenue portion of Route 7 could begin in August. This 1.2 mile portion of the upgrade is estimated to cost $37 million. Construction is expected to begin in the summer of 2012. For more information on this improvement, click here.

Estimated Cost:
The 2035 Draft Virginia Surface Transportation Plan estimates the cost of the entire Route 7 project at $251,576,000.