Home
The Alliance
Join/Make a Contribution
What You Should Know
Transportation Planning
Regional Priorities
Capital Beltway (I-495)
Dulles Greenway
Dulles Loop
Dulles Rail
Eastern Bypass
Fairfax County Parkway
Gainesville Interchange Project
I-66 Inside the Beltway
I-66 Outside the Beltway
I-95/I-395 HOT Lanes
I-95 Fourth Lane
Intercounty Connector (ICC)
Loudoun County Parkway
Manassas Battlefield Bypass EIS
Route 7
Route 9
Route 15
Route 28
Route 659/Belmont Ridge Road
Springfield Mixing Bowl
Techway
Tri-County Parkway
Western Transportation Corridor
Woodrow Wilson Bridge
 
Transportation Funding
Virginia General Assembly
Alliance Survey 2009
Air Quality
Regional Security
Demographic Information
Travel Demand Profiles
Transportation Links
Alliance Alert Archives
Contact Us
Manassas Battlefield Bypass EIS

Manassas National Battlefield Bypass Study—Profile

Congress passed the Manassas National Battlefield Park Amendments of 1988 requiring the study of alternatives to the conflicting uses of roads within the Park.

A Draft Environmental Impact Statement (DEIS) was initiated in November 2001 to analyze the impacts of relocating both Routes 29 and 234 from their current locations within the Park, and was conducted jointly by the Federal Highway Administration and the National Park Service. The DEIS was completed in January 2005 and Location Public Hearing was held on May 5, 2005.

(Alliance observation: Talk about a road to nowhere. The Battlefield Bypass appears on no local, regional or state plan. It serves no transportation purpose. It proposes to close two perfectly serviceable roadways (Route 29 and Route 234) through the Park, re-direct traffic on long, circuitous routes and will cost of hundreds of millions of dollars to taxpayers. Since the project serves no logical transportation purpose, any expenditure to advance or construct this facility should involve 100% National Park Service funds.)



The study included analysis of all elements necessary for the preparation of an Environmental Impact Statement, such as:

  • Allowing for closure of both Routes 29 and 234 within the Park

  • Accommodating existing traffic volumes.

  • Separating park and commuter traffic.

  • Maintaining transportation system linkage.

  • Maintaining access to the Park and private in-holdings within the Park.

  • Coordinating with other studies and agencies.

  • Providing extensive opportunities for public involvement.


To learn more about the Battlefield Bypass click on the links below

Preliminary Concepts/Alternatives Development

Cost Estimates

Next Steps



For official comments contact:


Mr. Jack Van Dop
Environmental Specialist, FHWA
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, VA 20166
jack.van.dop@fhwa.dot.gov



For questions about the study contact:

Mr. Kenneth Mobley
Parsons Transportation Group
Attn: Battlefield Bypass
10521 Rosehaven Street, 2nd Floor0
Fairfax, VA 22030
battlefieldbypass@parsons.com

Project Website: www.battlefieldbypass.com